The shelter type describes the construction of the shelter location.
Tunnel
Capacity
Estimated number of people the shelter can accommodate. For underground garages, calculated from parking spaces × factor.
16,625persons
Protection Level
Protection level: High (massive bunker with filters), Medium (underground garage, subway), Low (basement).
Low
Condition
Structural condition based on research or on-site inspection. May be outdated.
Not assessed
Year Built
Year the building was constructed. May differ from the year of last renovation.
1975
Tunnel type
Highway tunnel
Tubes
Number of tunnel tubes.
4
Actively used
Description
Neue Elbtunnelröhren (A7), eröffnet 1975. Vier Röhren unter der Elbe, bis zu 27 Meter tief. Moderner Straßentunnel.
Additionally researchedAdditional information was specifically gathered from various sources for this shelter — e.g. satellite imagery, map services, online sources, or on-site observations. The data is therefore generally more reliable, but without guarantee.