The shelter type describes the construction of the shelter location.
Subway Station
Capacity
Estimated number of people the shelter can accommodate. For underground garages, calculated from parking spaces × factor.
600persons
Protection Level
Protection level: High (massive bunker with filters), Medium (underground garage, subway), Low (basement).
Low
Condition
Structural condition based on research or on-site inspection. May be outdated.
Operational
Year Built
Year the building was constructed. May differ from the year of last renovation.
2000
Description
Nördliche Endstation der U2 in Pankow, eröffnet 2000. Moderne unterirdische Station mit Umstieg zur S-Bahn.
Not additionally researched: No additional research was conducted for this shelter. The data is based on publicly available sources and may be incomplete or outdated.